Results 1 to 20 of 55

Thread: Outsourcing Costa Rica? It may be a wise move during a recession.

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #24
    Join Date
    Apr 2005
    Location
    Cape Breton Island, Nova Scotia
    Posts
    6,816
    Blog Entries
    2

    Default

    Quote Originally Posted by DeeDubya View Post
    That should be 45KVA.
    I don't think so, he's talking about a generator, not a transformer. The output capacity of a generator of that size is usually expressed in kilowatts or watts (kW or KW, even though kW is the more correct way to express this) not volt amps. Volt amps and watts aren't the same thing.
    Last edited by CoventryCat86; 12-24-2008 at 12:28 PM.
    TBSCigars - "On Holiday"
    Grammar - It's the difference between knowing your crap and knowing you're crap.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •